top of page

The Rapid Bid Repair Cheat Sheet: See Exactly Which Numbers Are Leaking Out of Your Bids

Get the free one-page formula guide that shows subcontractors working for GCs the exact calculations behind True Job Cost, Float Cost, and complete bid pricing — so you can stop leaving money on the table starting with your next bid.

Here's something most subcontractors working for GCs never find out until a job is already done and the profit is gone:

You can win the bid, do the work, and still walk away with less than you planned. Not because labor ran over. Not because materials spiked.

Because of two things that almost never make it into the estimate:

1. What GC payment delays are actually costing you. When a GC takes 45, 60, or 90 days or beyond, to pay and you're covering labor and materials out of pocket in the meantime.  That gap has a real dollar cost. Most subcontractors never calculate it. It quietly drains the profit off every job before the check even arrives.

2. What your material markup is actually doing. There is a difference between adding 10% on top of your cost and actually recovering 10% of your final price. On a job with $37,000 in materials, that difference is $411. Left on the table. On every bid. Without anyone realizing it.

The Rapid Bid Repair Cheat Sheet is a free one-page quick-reference guide with the key formulas, inputs, and numbers to catch both leaks — before the next bid goes out.

BID REPAIR CHEAT SHEET PRODUCT PACKAGE FOR CHEAT SHEET GIVEAWAY 052526.png

WHAT YOU'LL GET:

  • Know the true cost of every job before the bid goes out — fully loaded, no surprises, no guessing

  • Calculate the exact dollar amount GC payment delays are costing you per job, so you can build it into your bid instead of absorbing it

  • Use the correct material markup formula and close the gap that has been quietly leaking money on every bid you've ever submitted

  • Walk into your next pricing conversation with a complete bid number you can stand behind with confidence

  • Keep it in your truck — one page, laminate it, run the numbers before any bid goes out

From 18 years of construction bookkeeping with real GC subcontractors — the same formulas used with real clients to close real profit gaps on real bids.

Send me the Bid Repair Cheat Sheet for Subcontractors

 Sent instantly. No spam. Unsubscribe anytime.

bottom of page